View Single Post
  #35001  
Old 13-07-2017, 08:59 AM
snipeshot08's Avatar
snipeshot08 snipeshot08 is offline
Samster
 
Join Date: Mar 2002
Location: Never Did Realised
Posts: 15,768
Mentioned: 15 Post(s)
Tagged: 1 Thread(s)
Quoted: 338 Post(s)
My Reputation: Points: 2394 / Power: 24
snipeshot08 has a reputation beyond reputesnipeshot08 has a reputation beyond reputesnipeshot08 has a reputation beyond reputesnipeshot08 has a reputation beyond reputesnipeshot08 has a reputation beyond reputesnipeshot08 has a reputation beyond reputesnipeshot08 has a reputation beyond reputesnipeshot08 has a reputation beyond reputesnipeshot08 has a reputation beyond reputesnipeshot08 has a reputation beyond reputesnipeshot08 has a reputation beyond repute
Re: All Vietnam Related TCSS / Info / Gatherings / Help Thread

Quote:
Originally Posted by Hurricane88 View Post
Pi sai land only can compete based on infra and productivity...caas also hv to close one runway to redraw aprons and routing..after runway 3 opens...


Ermmmm actually no need cause T5 is located at a different land parcel area totally out of the existing T1 to T4 zones, the aprons are specific to each terminal only so nothing is changed what they are going to do is that they will improve & extend the existing military runway to be the 3rd runway first then extend it to join the taxiways for the other 2 existing runways, after that they may then conduct improvement works on the existing 2 runways during off-peak hours in the night but there will be no closures of those runways

The existing 2 runways can never be closed as almost 1 airplane take off or land every 2 to 3 minutes so 1 runway closed means die cock stand for Changi Airpork yearly growth liao

Cheerios......SS08 ^_^
__________________
Signatureless

Last edited by snipeshot08; 13-07-2017 at 09:13 AM.